For each 150 sq.
Demo notes for flooring.
6 inches shall be placed between the concrete floor slab and the base course.
Existing flooring in all work areas to be removed down to the concrete deck.
Comply with the requirements of the following notes in this set of drawings which also apply to the demolition floor plans.
General notes for project on project information sheet g001 b.
Intent of demolition is to return building to basic core and shell with a level floor.
Lincoln academy relocation rsn rsn 11323 000 ajw 7180 oak st.
Lincoln academy relocation rsn rsn 11323 000 ajw 7180 oak st.
See typical tasks and time to remove flooring along with per unit costs and material requirements.
Provide under floor net ventilation opening size and locations equal to 1 sq.
Of under floor area and an access opening through the floor 18 x 24 min.
Arvada co 80003 06 07 13 issue for bidding and construction a1 1 8 1 ˇ0 second floor plan true project north sheet notes ˇ construction plans note 1 patch carpet at demolished wall 2 new wall.
Any demolition work beyond that shown on the approved.
Removals to include but not limited to vinyl composition tile carpet sheet flooring cermaic tile transitions adhesives mastics underlayment mortar bedding.
The cost to remove flooring starts at 1 26 2 46 per square foot but can vary significantly with site conditions and options.
Get fair costs for your specific project requirements.
Arvada co 80004 6980 pierce st.
See professionally prepared estimates for flooring removal work.
First floor demolition plan lincoln academy building corp.
General notes new construction on sheet a200 102.
Arvada co 80003 06 07 13 issue for bidding and construction a1 1 8 1 ˇ0 first floor plan sheet notes demolition plans note 1 demo existing base and upper cabinets 2 demo existing.
1 4 1 0 first floor demo residential demolition note.
Partial demolition of a residential structure in association with a construction project is only permitted where indicated on the approved plans.
If exists remove sheet applied tinting from all existing doors and windows.
Unit types 6 9 10 are new the demo for those instances is on d102.
Second floor plan lincoln academy building corp.
General notes for demolition plan 101.
Labc section 1808 6 larc section r403 1 8 r506 1 4.
Remove all interior partitions floor finishes and existing ceilings to structure except where noted to remain on the demolition plan.
Arvada co 80004 6980 pierce st.
1 4 1 0 existing floor plan 2 scale.