Step 1 preparing the concrete.
Diy flooring for exterior concrete slab.
Deck a floor premium modular composite outdoor flooring system kit in peruvian teak 204744133 when courtney clymer of lifestyled atlanta created her gorgeous outdoor entertaining area perhaps her most ingenious idea was laying deck flooring over the cement slab patio.
Full concrete slabs take about 6 weeks to fully cure.
In this case the squared slabs were installed among some gravel to create the outdoor dining area.
It can be physically strenuous and messy but it is a home improvement project that will allow you to cut labor costs by doing it yourself.
Scroll to the bottom for printable instructions.
A typical pad has a 4 inch layer of gravel underneath and about 4 inches of concrete on top.
Grease oils and stains may otherwise bleed through the paint.
It s a fairly simple project and the cost is reasonable 3 to 6 per sq.
Acid stained concrete precautions.
The full tutorial for resurfacing a floor is here.
From beneath my heart try this diy patio stain project looks like a tile floor.
Fake a concrete patio cover up with stain.
This is a great tutorial to learn how to stain concrete.
Before you begin to lay the tile over your concrete slab make sure the concrete is properly prepared.
Just to be sure she sealed the deal with two layers of water based polyurethane sealant for exterior concrete and paint roller.
She still can t believe that her stenciled diy patio floor cost her only a couple hundred dollars.
Diy stained concrete floor.
Since she used concrete paint it wasn t necessary to seal.
This diy concrete patio stain rug is easy and fast.
They have a great tutorial including the pattern template.
A concrete slab provides a firm stable base for pavers.
Laying floor tile over concrete is not a technically demanding job.
Cover the patio with a thin layer of sand lay pavers over it and the results look like a standard paver patio.
Here s a more traditional way to use concrete.
Ft but expect a weekend or two of hard labor.
The concrete must be cleaned thoroughly before painting or faux finishing.
Scrub the concrete with an all in one degreasing cleaning and etching product designed for concrete to help prepare the concrete for paint.
When building a landing for deck stairs typical codes require the pad to extend beyond the steps about 36 inches behind the steps about 12 inches and on the sides of the steps about 6 inches.