Install two four foot cross tees between the two main beams in line with the first two border cross tees.
Drop ceiling grid installation instructions.
300mm 45 0 45 0 300mm 1 80mtr.
Slope 1 in 1 8mtr in any plane if more use counter splaying wires step 5.
Screw an eyelet into every.
Once you ve figured out the size of the border row measure back from the cross tee slots and cut your main tees to size.
Installing 2 x 4 drop ceiling panels determine the size of the border panels to get the length of your border panels divide the width of the room by the.
Then layout your tile spacing and see how it looks.
To allow for ceiling tile installation and accessibility the minimum drop is 3 with traditional hanger wire or 2 5 with quickhang grid hooks.
The main runners will support the.
Suspended ceiling for 2 x 4 ceiling panels.
Determine the size of your border panels from side to side.
Typical installation tee patterns 2 x 4 grid layout 2 x 4 tee layout 2 x 2 tee layout planning for 2 x 2 ceiling panels.
Cut the main tees for the drop ceiling hangers.
Install wall molding mark the desired new ceiling height on the wall.
Snap the chalk line tool to create this.
Don t assume the wall is straight.
If you are using 2 x 2 panels you need to lay out your grid differently.
Literally measure and make a to scale drawing of each room.
Quickhang instructions are notated by a gray background.
Three easy steps to install your ceiling 1.
If the grid is not square shorten one of the main beams until the diagonals are equal.
Drop into place a.
Check the original sketch of the room to determine this location.
Install hanger wire or.
Join sections of main beam.
The cross tee slots must line up.
Measure across the diagonals of the 2 x 4 opening.
Cut the main runners to fit the length of your room perpendicular to the joists.
The measurements will be the same if the grid is square.
Trim border panels cutting panel face side up b.
Putting in the grid system 1.
Be sure the suspension wires are securely fastened.
Lift panel at angle through grid.
Additional 2 cross tees dotted lines are installed parallel to the main tees 2 o c.
Step 1 design your drop ceiling grid it starts with a game plan.
Measure and cut the main tees according to a cross tee guideline.
Secure the end of a chalk line on one end of.
Installation of hangers ceiling soffit duct section threaded rod hanger wire vertical support slotted bar main tee for suspending the ceiling.
Locate the first suspension wire for each main tee directly above the point where the first cross tee meets the main tee.
A b step install panels 3 2 x 2 installation 1.